Harbour & Marine

TANJUNG PELEPAS, JOHOR, PHASE I

The Project comprises of detailed design & construction of back of port infrastructure development phase 1.

LOCATION

Pelabuhan Tanjung Pelepas, Johor

CLIENT

Pelabuhan Tanjung Pelepas Sdn Bhd

COMPLETION DATE

2000

DETAIL WORKS INCLUDED

• Port Operation Building & Workshop
• Infrastructure works e.g. pavement, drainage,   E&M works, water supply and sewerage


• Container yard


• Electrical Sub-Stations

SERVICES PROVIDED

• Master planning
• Preparation of tender documents & tender   evaluation


• Investigation works
• Construction supervision and administration


• Detailed design

TANJUNG PELEPAS, JOHOR, PHASE II A

The Project comprises of detailed design & construction of back of port infrastructure development phase II.

LOCATION

Pelabuhan Tanjung Pelepas, Johor

CLIENT

Pelabuhan Tanjung Pelepas Sdn Bhd

COMPLETION DATE

2005

DETAIL WORKS INCLUDED

• Port Operation Building & Workshop
• Infrastructure works e.g. pavement, drainage,   E&M works, water supply and sewerage


• Container yard
• Detailed design


• Electrical Sub-Stations

SERVICES PROVIDED

• Master planning
• Preparation of tender documents & tender   evaluation


• Investigation works
• Construction supervision and administration


• Detailed design

PHASE IIA AND PHASE IIB EXPANSION OF NORTH BUTTERWORTH CONTAINER TERMINAL, PENANG PORT

The project comprises of an initial Phase IIA expansion of 250m long x 56m wide berth and a further Phase IIB expansion of 100m long x 56m wide berth to the existing 350m long x 56m wide berth. The jetty is an open piled structure comprises of a suspended reinforced concrete deck supported on vertical and raked precast prestressed concrete pile. The berth is designed for berthing of vessels of up to 72,600t displacement tonnage, a uniformly distributed load of 38.4 kN/m2, container crane wheel load (rail gauge of 17m), container stacking up to 3-tier high on deck; 40t mobile crane, HA loading and 45 units HB loading, and all container handling transporters.
LOCATION

Butterworth, Penang

CLIENT

Penang Port Commission – Phase IIA Muhibbah Engineering (M) Bhd – PhaseIIB

COMPLETION DATE

1999 – PHASE IIA, 2001 – PHASE IIB

DETAIL WORKS INCLUDED

• Wharf structure including substation building, crane rail, fenders, mooring facilities, ladder and services trenches
• Associated works such as lighting, fire fighting services, fresh water supply and electrical installation for the sub-station

SERVICES PROVIDED

• Detailed design


• Construction supervision


• Geotechnical investigation & foundation design

DEVELOPMENT OF KEMAMAN PORT, TERENGGANU

The project involved the construction of a new harbour on a fairly open stretch of coast, where difficulties from wind, current and swell were foreseen which have considerable influence on the design of the approach channel. Also, a deep turning basin and berthing area had to be dredged in the shallow water.

LOCATION

Kemaman, Terengganu, West Malaysia

CLIENT

Terengganu State Economic Development Corporation and Petronas Gas Sdn Bhd

COMPLETION DATE

1985

DETAIL WORKS INCLUDED

• Reclamation and shore installation for service of the supply barges
• LPG jetty (1 berth) to accommodate tankers between 1,000 and up to 40,000 DWT
• 4 breasting dolphins, 4 mooring dolphins and a central platform which is reached by a 300m long approach bridge I
• East and South Breakwater (rubble mound type) of approximately 2,000m to facilitate entrance of ship, protect LPG Basin
• 800m long breakwater to protect 360m quaywall (5 berths) of reinforced concrete caissons, dredged basin and approach channel
• Dredging (11 million c.u.m) for east wharf, turning basin and channel and reclamation for east wharf and Telok Kalong Industrial Estate
• 648m long east wharf (3 berths) constructed using R.C. caisson and subjected to loading from crane, HB loading, bollard pull and berthing load of 150,000 DWT   vessels

SERVICES PROVIDED

• Detailed design


• Construction supervision


• Geotechnical investigation & foundation design

WHARF 8 EXTENSION (WHARF 8A), UPGRADING OF WHARF 16 AND ASSOCIATED WORKS

The Wharf 8 extension comprises the construction of a 350m multipurpose wharf and associated facilities with berthing furniture, a pair of 20m wide approach access bridges, a new electrical substation, a wharf office, including mechanical and electrical works, water mains, fire hydrant, high mast lighting, dredging at new berth area and removal of sediment mound under the existing wharf, demolition of the existing marine jetty, part of its bridges, existing roll on roll off ramp, existing substation, dismantling of existing tower light and demolition of foundation.  The works for the upgrading of Wharf 16 is principally associated with the upgrading of existing crane rail beam and turn over pit, wharf ancillaries, including cable protection system, rail and rail clip, replacing existing fenders, carry out conditional assessment and erecting 5 new high mast of 45m height.

LOCATION

Port Klang, Selangor

CLIENT

Northport (M'sia) Sdn Bhd

COMPLETION DATE

2015

DETAIL WORKS INCLUDED

• Associated works such as high mast lighting, telephone and firefighting services, fresh water supply and sewerage works
• Wharf and approach bridges structures including services trench, crane rail and cable turnover pit, fenders, cat ladders, wharf office, toilet buildings,
  substation and high masts

SERVICES PROVIDED

• Detailed design
• Hydrographic survey


• Construction supervision
• Navigational and mooring study


• Geotechnical investigation design

PROPOSED REPAIR AND REFURBISHMENT OF EXISTING JETTY AT LUMUT PERAK

The Malayan Flour Mill existing jetty was used for the import of materials for the manufacturing of their primary product of flour. The repair and refurbishment works of the existing jetty comprises of steel pipe piles, steel fender frame structure and etc.  The design and recommendation of the repair methods were proposed and carried out including pile jacketing on the existing steel pipe piles and replacement of corroded steel frame structure.

LOCATION

Lumut, Perak

CLIENT

Malaysian Flour Mills Sdn Bhd

COMPLETION DATE

2010

DETAIL WORKS INCLUDED

• Evaluation of the existing jetty concrete structure and the steel pipe piles condition
• Design and recommendation of the repair methods

SERVICES PROVIDED

• Analysis


• Design


• Construction supervision

Integrated Management System
&
Quality Policy

MS ISO 9001:2015 Quality Management Systems

MS ISO 14001:2015 Environmental Management System

MS ISO 45001:2018 Occupational Health and Safety Management System