Water Supply Network System
CYBERJAYA DEVELOPMENT - WATER SUPPLY DEVELOPMENT PROJECT
The Project consists of:-
Stage 1 : Feasibility and Concept Design
Stage 2 : Detailed Engineering Design and Construction of Phase 1A Water Supply System.
LOCATION
Selangor, Darul Ehsan
CLIENT
Setia Haruman Sdn Bhd
COMPLETION DATE
2003
dETAIL WORKS INCLUDED
• MS pipeline from 400mm to 100mm dia. (approx. 20km)
• 1 no. of 34 ML RC reservoir
• 1 no. 27 ML RC reservoir
• 6km of 1600mm dia. Dedicated Water main
SERVICES PROVIDED
• Assessment of overall water demand
• Detailed engineering design including soil investigation, preparing tender documents
• Preliminary cost estimates
• Computer network modelling of water supply system
• Feasibility and concept Study Report
• Construction supervision
PUTRAJAYA WATER SUPPLY DEVELOPMENT PROJECT
Stage 1 Feasibility and Concept Design for the Water Supply Development. Stage 2 Detailed Engineering Design and Construction for the Water supply System for Phase 1A, 1B & 2
LOCATION
Putrajaya, Wilayah Persekutuan
CLIENT
Putrajaya Holdings Sdn Bhd
COMPLETION DATE
1998
DETAIL WORKS INCLUDED
• 2 suction tanks
• Pump houses
• 5 nos of service reservoir
• A balancing reservoir
• Assessment of overall water demand and computer network modelling of the trunk and distribution mains
• Laying of trunk and distribution mains ranging from 250mm dia to 1,800mm dia. mild steel pipes for supplying water to Precincts 1 to 20
SERVICES PROVIDED
• Feasibility study, conceptual
• Soil investigation
• Detailed design
• Tender preparation
• Topographical ground survery
• Construction supervision
PROPOSED WATER SUPPLY SYSTEM TO PULAU REBAK BESAR, LANGKAWI
The project involves the detailed investigation and design of 315mm OD submarine pipeline (length – 2.1km) for supplying potable water to the holiday island of Rebak Besar from Langkawi Island and the refurbishment of existing pumphouse and raising of existing FRP tank.
LOCATION
Rebak Island, Pulau Langkawi, Malaysia
CLIENT
Rebak Island Marina Berhad
COMPLETION DATE
1997
DETAIL WORKS INCLUDED
• Raising of existing FRP tank
• Refurbishment of existing pumphouse
• 315 mm OD submarine pipeline (length 2.1 km) for supplying potable water island another Island
SERVICES PROVIDED
• Detailed engineering investigation
• Detailed design
• Topographic and hydrographic survey
• Tender documentation
• Soil investigation
• Construction supervision
EXPANSION OF MENGKUANG DAM PROJECT, PENANG PHASE 1 – CONSTRUCTION OF DAM AND ASSOCIATED WORKS (PIPELINE)
The Project consists of construction of a new dam adjacent to and heighting of the existing Mengkuang Dam, and laying of 2km of 2.2m dia M.S. Pipe from the new dam to the existing 1.8m dia M.S. Pipe. SSP is involved in the design and construction supervision of this 2.2m dia M.S. Pipe alignment.
The 2.2m dia. M.S. Pipe is the first project in Malaysia to adopt polyurethane internal lining for the steel pipe
LOCATION
Pulau Pinang
CLIENT
Jabatan Bekalan Air, KTAK
COMPLETION DATE
Current
DETAIL WORKS INCLUDED
• Pipe laying works
• Pipe on pier support
• Pipe installation with open-cut method
• Pipe jacking due to deep invert levels, using composite concrete cladded 2.2m dia. M.S. Polyurethane lined pipes
SERVICES PROVIDED
• Topographical survey
• Detailed engineering design
• Soil investigation
• Construction supervision
• Utilities detection and mapping
• Contract administration
UNIVERSITY TEKNOLOGI MARA, PUNCAK ALAM, PHASE 1
Universiti Teknologi Mara (UiTM), Puncak Alam is one of the five UiTM branches in Selangor. The project involves a range of main infrastructure works, Satelite A & Satelite B Building works which is situated on Lot PT1576 and PT1568 with total land area of approximately 1,000 acre. The campus is projected to cater for the ultimate population of 20,000 students and 5,000 staff.
LOCATION
Puncak Alam, Selangor
CLIENT
Universiti Teknologi Mara (UiTM)
COMPLETION DATE
2009
DETAIL WORKS INCLUDED
• 1.2MG Service Reservoir
• 1,600/600mm diameter trunk main
• Related Distribution & Reticulation Mains
• Booster Pump Station No. 1 consisting of a 0.8MG suction tank and pump house
• Booster Pump Station No. 2 consisting of a 2.0MG suction tank cum reservoir and a pump house
SERVICES PROVIDED
• Master planning
• Detailed design
• Construction supervision
PLANNING & REVIEW OF MASTERPLAN STUDY FOR WATER SUPPLY SYSTEM IN CYBERJAYA FLAGSHIP ZONES
Cyberjaya, Malaysia’s first multimedia intelligent city, is strategically located at the heart of the Multimedia Super Corridor (MSC) – half way between the capital city of Kuala Lumpur and the KL International Airport, with the Federal Administrative Center Putrajaya, as its immediate neighbour.
LOCATION
Cyberjaya
CLIENT
Setia Haruman Sdn Bhd
COMPLETION DATE
2013
DETAIL WORKS INCLUDED
• Laying trunk
• 1 no of pump house
• 6 nos of service reservoirs
• Distribution mains ranging from 150mm dia. D.I pipe to 1,800mm dia. M.S pipe to serve current population of 100,000 people
SERVICES PROVIDED
• Engineering study and review overall water supply system
• Identify the capacity of the existing and future reservoirs
• Changes to the pipe size (trunk main and distribution pipes) to accommodate higher flow rate
ASSET REPLACEMENT PROGRAMME FOR WATER DISTRIBUTION ASSETS IN CENTRAL REGION
The project involved establishing an inventory and condition of the existing water distribution assets to form the basis for CAPEX and providing an implementation programme for the rehabilitation/ replacement/ upgrading works to keep and extend the operational life-span of the assets.
LOCATION
District of Klang, Petaling & Federal Territory of Kuala Lumpur
CLIENT
Syarikat Bekalan Air Selangor Sdn Bhd (SYABAS)
COMPLETION DATE
2009
DETAIL WORKS INCLUDED
• Supervision of works implementation
• Detailed engineering solution and design for the implementation of such works
• Identify rehabilitation/ replacement/ upgrading works to keep and extend the operational life-span of the assets
• Field works to survey and study the existing conditions of 122 pumping stations with 134 suction tanks, pumping mains and 286 reservoirs
• Cost estimates for the rehabilitation/ replacement/ upgrading works and draw up priorities and implementation programme of such works
SERVICES PROVIDED
• Preliminary study
• Detailed design
• Construction supervision
Integrated Management System
&
Quality Policy
MS ISO 9001:2015 Quality Management Systems
MS ISO 14001:2015 Environmental Management System
MS ISO 45001:2018 Occupational Health and Safety Management System