Wastewater & Sewage Treatment Plant

JELUTONG SEWAGE TREATMENT WORKS

The Project comprises the construction and erection, completion, operation and maintenance of a sewage treatment plant (STP) catering for a population equivalent (PE) of 1.2 million for Georgetown, Penang.

LOCATION

Jelutong, Penang

CLIENT

Kementerian Tenaga, Air dan Komunikasi

COMPLETION DATE

2007

DETAIL WORKS INCLUDED

• Main inlet pump station
• Effluent disinfection channel and outfall
• Digester equipment building
• Main inlet substation building
• TNB substation and generator set building
• Common utilities trench
• C&S infras


• Sludge holding tank
• Anaerobic digester tank
• Reclaimed effluent pump station
• Administration building
• Guard house
• Scada System & Instrumentation


• Sequential batch reactor
• Gas holding tank
• Centralised sludge storage buildings
• Vehicle depot and maintenance workshop
• Refuse chamber
• M&E works

SERVICES PROVIDED

• Planning and Detailed Design
• Contract Administration


• Design Management


• Construction Supervision

BUNUS PHASE 2 CENTRALIZED SEWAGE TREATMENT PLANT

Designed for 750,000 PE to meet the stringent modified Standard A effluent quality (AN =2mg/L, BOD =5mg/L, NH3 =20mg/L) under Greater KL River of Life (ROL). Fully mechanized sludge treatment facilities and membrane filtration as tertiary treatment, effluent reuse and methane gas harvesting for power generation. Alternative design to Original Design (ACAS System). Award Winning Project from Kementerian Tenaga, Teknologi Hijau & Air, ACEM Engineering Award 2019.
LOCATION

Kuala Lumpur

CLIENT

Ekovest-MRCB JV Sdn Bhd

COMPLETION DATE

2018

DETAIL WORKS INCLUDED

• Preliminary treatment works
• Tertiary treatment building
• Anaerobic digester tank
• Gas storage tanks
• Administration building
• Guard house
• M&E works


• Sequential batch reactor
• Sludge holding tank
• Digester equipment building
• Gas flare
• Odour removal system
• Filtrate / chemical house
• C&S infrastructural works


• SBR blower house
• Sludge treatment building
• Biogas Genset Room
• Sludge cake yard
• TNB substation
• SCADA System & Instrumentation

SERVICES PROVIDED

• Detailed design
• Contract administration


• Authority submission


• Construction supervision

PEMBINAAN LOJI RAWATAN KUMBAHAN SERANTAU DAN RANGKAIAN PAIP PEMBETUNGAN DI BANDAR KUANTAN, PAHANG (REKA DAN BINA)

Centralised Sewage Treatment Plant (CSTP) is designed for the capacity of 200,000 Population Equivalent (PE) for Phase 1 (ultimate 400,000 PE) with Extended Aeration (EA) treatment system, equipped with Green Technology Initiatives (i.e. effluent reuse and solar panel for internal usage).
LOCATION

Bandar Kuantan, Pahang

CLIENT

Jalur Cahaya Sdn Bhd

COMPLETION DATE

Current

DETAIL WORKS INCLUDED

• Extended Aeration (EA) treatment system
• The effluent quality to comply Standard A as per MSIG
• Design of treatment process, structure, geotechnical and M&E
• Centralised Sewage Treatment Plant (CSTP) designed for the capacity of 200,000 Population Equivalent (PE) for Phase 1 (ultimate 400,000 PE)

SERVICES PROVIDED

• Planning
• Contract Administration


•Design Review


• Construction Supervision

BAYAN BARU SEWAGE TREATMENT WORKS

The Project comprises the construction and erection, completion, operation and maintenance of a sewage treatment plan (STP) catering for a population equivalent (PE) of 400,000 for Bayan Baru, to replace the two (2) existing oxidation ponds.

LOCATION

Bayan Baru, Penang, Malaysia

CLIENT

Sewerage Services Department, Ministry of Housing And Local Government

COMPLETION DATE

2003

DETAIL WORKS INCLUDED

• Main inlet pump station
• Clarifier
• Surplus activated sludge tank
• Tank reception facilities
• Administration building & maintenance   workshop


• Preliminary treatment tank
• Effluent collection chamber and outfall
• RAS/SAS sludge pump station
• Reclaimed effluent pump station
• Sludge thickening and dewatering buildings


• Modified oxidation ditch
• Chlorine contact tank
• Electrical substations
• Sludge storage tank and building

SERVICES PROVIDED

• Planning and Detailed Design
• Design Management


• Project Management
• Construction Supervision


• Programme Management
• Contract Administration

INTEGRATED SEWERAGE PROJECT IN PUTRAJAYA, MALAYSIA

The development of the wastewater system for Putrajaya comprises of modern water-borne sewage collection system with lifting stations and centralized sewage treatment plants (STP). Two sites for the STP have been identified; one to the north-east of the proposed development for STP1 with 75,000 P.E. and the other south for STP2 with 600,000 P.E.

LOCATION

Putrajaya Federal Government Administrative Centre for Malaysia

CLIENT

Putrajaya Holdings Sdn Bhd

COMPLETION DATE

2000

DETAIL WORKS INCLUDED

• Sewage Treatment Plant No. 1 (75,000 P.E.)
• Sewage Treatment Plant No. 2 (600,000 P.E.)
• Sewage Switching Plant and Pumping Stations (18 nos)
• Sewage Collection Systems ( 90km of Trunk Sewer network system)

SERVICES PROVIDED

• Sewerage Master Plan Study
• Construction Supervision
• QA/QC


• Conceptual Design
• Project Management
• Programme Management


• Detailed Design
• Construction Management
• Project Commissioning

PUTRAJAYA WASTEWATER DEVELOPMENT PROJECTS

The project involves feasibility, concept and detailed design of the Overall Sewerage System for Putrajaya with a development area of approximately 4950 ha. The project is implemented in phases between year 1996 to year 2010. The sewerage Development includes the laying of trunk sewers up to 2100mm diameter in size, construction of 15 numbers of sewage pumping stations with capacity of up to 250,000PE, two(2) numbers of Sewage Treatment Plant of capacity 100,000PE and 600,000PE), force mains of size up to 1000mm in diameter.

LOCATION

Putrajaya,Wilayah Persekutuan Malaysia

CLIENT

Putrajaya Holdings Sdn Bhd

COMPLETION DATE

2012

DETAIL WORKS INCLUDED

• SCADA control and instrumentation
• Preliminary and detailed design of sewerage   system-pump station, pipeline, treatment   plants etc.


• Hydraulic analysis
• Site survey and geotechnical investigation
• Formulation, evaluation and assessment of   overall catchment planning


• Odour control
• Sludge treatment
• Emergency Response Plans for Pump Stations

SERVICES PROVIDED

Master Planning, Detailed Design and Supervision of Construction for Sewerage Works as follows:-
• Sewers
• Pump Stations
• SCADA and PLC control
• Sewage Treatment Plants
• Pumping equipment and ancillary works

YEN SO SEWAGE TREATMENT WORKS

Yen So STP is designed for the capacity of 200,000m3/day or (900,000PE), treating sewage generated from Kim Nguu and Set River Catchments and Yen So Development to equal or better than discharge standard TCVN 2005 – 5945.

LOCATION

Hanoi, Vitenam

CLIENT

Gamuda Land Vietnam

COMPLETION DATE

2010

DETAIL WORKS INCLUDED

• River Barrage
• Sequential batch reactor
• Gas holding tank
• Digester equipment building
• Vehicle depot and maintenance workshop
• Refuse chamber
• C&S infrastructural works


• Main inlet pump station
• Effluent disinfection channel and outfall
• Reclaimed effluent pump station
• Main inlet substation building
• Substation and generator set building
• Scada System & Instrumentation


• Sludge holding tank
• Anaerobic digester tank
• Centralised sludge storage buildings
• Administration building
• Guard house
• M&E works

SERVICES PROVIDED

• Planning and Detailed Design
• Construction Supervision


• Design Management


• Contract Administration

INTEGRATED SEWERAGE PROJECT FOR KOTA KINABALU, SABAH

Kota Kinabalu has been experiencing dynamic growth in the last decades. The Sabah State Government recognise the urgent need for the provision of centralised sewerage system required for improving the environment and living conditions of the people; has launched a project to centralise and upgrade the existing sewerage systems for Central Catchment and Southern Catchment in Kota Kinabalu

Central Catchment covers a total land area of approximately 6,063 hectares with the projected population equivalent (PE) of 200,000 up to year 2020. The scope of works for Central Catchment is to provide a sewerage network of pumping stations and sewers conveying flows to existing Regional Sewage Treatment Plant (RSTP) in Inanam. The Phase 1 sewerage works for Central Catchment involves laying of 15km of sewers and upgrading the existing RSTP to cater the flows subsequently.

Southern Catchment covers a total land area of approximately 5,106 hectares with the projected population equivalent (PE) of 355,380 up to year 2020. The scope of works for Southern Catchment is to provide a sewerage network of pumping stations and sewers conveying flows to a new Regional Sewage Treatment Plant in Penampang. The Phase 1 sewerage works for Southern Catchment involves construction of 10km of sewers and building a new RSTP in Penampang.

LOCATION

Kota Kinabalu, Sabah, Malaysia

CLIENT

Jabatan Kerja Raya, Sabah

COMPLETION DATE

2010

DETAIL WORKS INCLUDED

• New Sewage Pumping Stations (2 nos)
• Sewage Collection Systems (25km of Trunk Sewer)
• Refurbishment of existing Pumping Stations (8 nos)
• Upgrading existing Sewage Treatment Plant at Inanam
• Decommissioning of existing Pumping Stations and Sewage Treatment Plants
• New Sewage Treatment Plant in Penampang (ultimate 300,000 PE, 75,000 PE for Phase 1)

SERVICES PROVIDED

• Sewerage Master Plan Study
• Construction Supervision


• Conceptual Design
• Contract Administration


• Detailed Design

CYBERJAYA WASTEWATER PROJECT

The project involved conceptual and detailed design under the design and build concept of two units of sewage pump stations for Cyberjaya with a development area of approximately 7,000 ha. The scope of works includes the laying of sewer force mains 600mm and 1,000 mm diameter in sizes, construction of 2 numbers of sewage pumping stations with capacity of 74,500PE (PS4), and 290,000 PE (PS2-9).

LOCATION

Cyberjaya, Malaysia

CLIENT

Setia Hauruman Sdn Bhd

COMPLETION DATE

2007

DETAIL WORKS INCLUDED

• Odour control
• Hydraulic computation
• Site survey and geological investigation
• Formulation, evaluation and assessment of overall catchment planning
• Preliminary and detailed design of sewerage system- Pump station, pipeline, and etc.

SERVICES PROVIDED

• Conceptual and Detailed Design


• Construction Supervision


GENTING HIGHLANDS 60,000 PE SEWAGE TREATMENT PLANT

The Project comprises the construction and erection, completion, operation and maintenance of a new sewage treatment plan (STP) catering for an additional population equivalent (PE) of 60,000 as extension to the existing sewage treatment plant for Genting Highlands First World Hotel.

LOCATION

Genting Highlands, Pahang, Malaysia

CLIENT

Resorts World Bhd

COMPLETION DATE

2008

DETAIL WORKS INCLUDED

• Inlet screening chamber
• Two modules of Sequencing Batch Reactor   (SBR) tanks
• Sludge thickening and dewatering building
• Supervisory Control and Data Acquisition   (SCADA) for semi-automated monitoring and   process controlling


• Grit chamber
• Surplus activated sludge tank
• RAS/SAS sludge pump station
• Odour removal system
• Administration building & maintenance   workshop


• Grease chamber
• Chlorination tank
• Electrical substation
• Reclaimed effluent pump station
• Sludge storage tank and building

SERVICES PROVIDED

• Planning and Detailed Design
• Design Management


• Project Management
• Construction Supervision


• Programme Management
• Contract Administration

JAYA ONE STP & WASTEWATER TREATMENT

Review & Upgrade of the Performance of Odour Control System of Jaya One STP.

LOCATION

Selangor

CLIENT

Tetap Tiara Sdb Bhd

COMPLETION DATE

2014

DETAIL WORKS INCLUDED

• Air Sampling & Analysis
• Oil & Grease Removal Facility for Wastewater
• Review and Upgrade of STP (including Wastewater Characteristics Study)

SERVICES PROVIDED

• Review & upgrade existing plant


• Design & build


FEASIBILITY STUDY OF CONSTRUCTED WETLANDS FOR SEWAGE TREATMENT

To evaluate and assess the practicality of Constructed Wetlands System as alternative to sewage treatment system in urban area. Case study at Puchong Regional Sewage Treatment Plant (PTG 248).
LOCATION

Puchong, Selangor

CLIENT

NAHRIM

COMPLETION DATE

2021

DETAIL WORKS INCLUDED

• Produce preliminary design
• Cost estimation of constructed wetland for sewage treatment
• Conduct feasibility study for constructed wetland for sewage treatment
• Collect and analyse information from previous flood reports, site investigation

SERVICES PROVIDED

• Data collection


• Site investigation detailed design


• Cost estimation

INDUSTRIAL WASTEWATER TREATMENT PLANT, W.R GRACE SPECIALTY CHEMICALS (M) SDN. BHD. (GRACE), PAHANG

Alternative Analysis (FEL 1) for ammonical nitrogen (AN) treatment technologies to comply with Standard B of Environmental Quality Act (EQA) 1974: Environmental Quality (Industrial Effluent) Regulation 2009.
Sampling and compositional analysis for wastewater, budgetary cost estimates, risk management overview, project execution plan.

LOCATION

Pahang

CLIENT

W.R GRACE SPECIALTY CHEMICALS (M) SDN. BHD.

COMPLETION DATE

2020

DETAIL WORKS INCLUDED

• Project execution plan
• Budgetary cost estimates
• Risk management overview
• Sampling and compositional analysis for wastewater
• Alternative Analysis (FEL 1) for ammonical nitrogen (AN) treatment technologies to comply with Standard B of Environmental Quality Act (EQA) 1974:   Environmental Quality (Industrial Effluent) Regulation 2009

SERVICES PROVIDED

Option Analysis & FEL1 Report

MAS INDUSTRIAL WASTEWATER TREATMENT PLANT

Centralised Industrial Wastewater Treatment Plant for metal and oil bearing effluent, sludge storage design, tender specifications, site supervision, project management & testing/commissioning.

LOCATION

Subang International Airport, Malaysia

CLIENT

Malaysia Airlines

COMPLETION DATE

1994

DETAIL WORKS INCLUDED

• Sludge storage design
• Testing and commissioning of the wastewater treatment plant
• Centralised Industrial Wastewater Treatment Plant for metal and oil bearing effluent

SERVICES PROVIDED

• Detailed design
• Contract administration


• Authority submission


• Construction supervision

Integrated Management System
&
Quality Policy

MS ISO 9001:2015 Quality Management Systems

MS ISO 14001:2015 Environmental Management System

MS ISO 45001:2018 Occupational Health and Safety Management System