KL INTERNATIONAL AIRPORT PASSENGER TERMINAL CONTACT PIER AND SATELLITE BUILDING

The airport was planned to become the major gateway into Malaysia and a major hub for the Southeast Asia Region to handle 25 million passengers per anum.

LOCATION

KLIA, Sepang

CLIENT

KLIAB

COMPLETION DATE

1998

DETAIL WORKS INCLUDED

• Main terminal building
• Contact pier
• Satellite building


• Taxiways
• 4,000m - long runways


• Aprons
• Aircraft parking lot

SERVICES PROVIDED

• Project Management


• Quality Assurance of Civil & Structural Works


• Design Audit

KOTA KINABALU INTERNATIONAL AIRPORT

The Project comprises design and construction of the proposed upgrading and extension of Kota Kinabalu International Airport terminal building inclusive of Baggage Handling System and special equipment and the landside infrastructure and facilities.

LOCATION

Kota Kinabalu, Sabah

CLIENT

Ministry of Transport, Malaysia

COMPLETION DATE

May 2009

DETAIL WORKS INCLUDED

• Baggage handling system
• 30m multi-span 3-dimensional roof
• Ingress and egress elevated bridges
• Cast in-situ reinforced concrete beam and slab floor with precast half slab system
• Infrastructure services around the airport, i.e., water tower, sewerage treatment plant and car park
• Upgrading and extension of Kota Kinabalu International Airport 3-storey terminal building, with a passenger per peak hour (pph) of 3,200 passengers

SERVICES PROVIDED

• Preparation of Bid Design


• Detailed Design


• Construction Drawing & Supervision

NEW A-380 HANGAR AND WORKSHOP FACILITIES

The Project comprises design and construction of the proposed A-380 Hangar / Workshop Facilities and Associated M&E works at Mas complex, KLIA, Sepang.

LOCATION

KLIA, Sepang

CLIENT

Malaysia Airline System Berhad (MAS)

COMPLETION DATE

August 2007

DETAIL WORKS INCLUDED

• Power Plant
• 5-storey Workshop Building measuring 32m x 294m
• 5-storey Amenity cum Car Park Building about 32m x 144m
• 2-storey Utilities Bay measuring at 14m in width and 100m in depth
• Linkway bridges to connect the new Hangar Building to the existing hangar
• Industrial Waste Treatment Plant Building and Drum Storage Shed External works such as parking apron, roads drain, fencing and all associated works
• Covered Hangar Building with a clear column free space of 230m x 100m in plan, 30.55m minimum clear height and with the top roof at a height not exceeding   42m from ground level to house 2 wide body A380, B737 and other aircraft configurations
• Mechanical and electrical works inclusive of tele-platform, hoist lifts, compressed air supply, air conditioning, ventilation, fire protection and fire fighting
  systems, telecommunication, electrical power supply lighting and lightning protection

SERVICES PROVIDED

• Preparation of Concept Design


• Project Management


MAS CATERING BUILDING IN KUALA LUMPUR INTERNATIONAL AIRPORT

The Catering building was the largest kitchen cum office for the production of inflight meals in Malaysia serving MAS and most of the International Airlines flying to and from Malaysia. It was estimated that an average 35,000 meals could be produced per day at its full operation.

LOCATION

KLIA, Sepang

CLIENT

Malaysia Airline System Berhad (MAS)

COMPLETION DATE

1997

DETAIL WORKS INCLUDED

• 3 services tunnels running below ground floor
• Double layers brick walls clad with preformed insulated panels
• L shaped reinforced concrete structure with heights vary from 1-storey at the plant room to 5-storey at the Penthouse

SERVICES PROVIDED

• Structural design
• Equipment supports
• QA/QC support during the construction
• Design coordination for the installation of kitchen equipment, power and free system and various works discipline

PROPOSED UPGRADING OF AIRFIELD PAVEMENT AND ASSOCIATED WORKS AT SULTAN ISMAIL PETRA AIRPORT, KOTA BHARU, KELANTAN

The Project consists of upgrading airport parking apron and taxiways to Airbus A330-200 loading for Kota Bharu Airport, Kelantan for Malaysia Airport Berhad.

LOCATION

Kota Bharu, Kelantan Darul Naim

CLIENT

Malaysia Airports Bhd

COMPLETION DATE

Sept 2007

DETAIL WORKS INCLUDED

• Taxiway to cater for Airbus A330-200
• Airfield Ground Lighting at taxiways
• Parking apron for the five numbers of aircraft stands
• Pavement marking at parking apron and taxiways

SERVICES PROVIDED

• Planning and detailed design of civil works


• Contract administration


• Construction supervision

Integrated Management System
&
Quality Policy

MS ISO 9001:2015 Quality Management Systems

MS ISO 14001:2015 Environmental Management System

MS ISO 45001:2018 Occupational Health and Safety Management System