Dams

BEKOK DAM, JOHOR, MALAYSIA

This Project is an earthfill dam measuring 16m high x 860m long with spillway, regulating outlet stilling basin, discharge channel and auxiliary spillway

LOCATION

Bekok Dam, Negeri Johor

CLIENT

Jabatan Pengairan dan Saliran, Malaysia

COMPLETION DATE

1991

DETAIL WORKS INCLUDED

• Earth fill dam with spillway
• Associated structures such as pumping   station, access road and intakes


• Regulation outlet
• Auxiliary spillway


• Stilling basin
• Discharge channel

SERVICES PROVIDED

• Geotechnical investigation & survey
• Environmental impact assessment
• Bid Evaluation


• Hydrology & hydraulic studies
• Detailed design
• Construction Supervision


• Water resources studies
• Contract Documentation
• Testing, Commissioning & Handing Over

SG. KELINCHI DAM, TRANSFER TUNNEL, PUMPING STATION & ASSOCIATED WORKS

The Project is an inter-basin transfer of water from Upper Muar catchment to Sg. Terip for augmenting water supply to the 2 districts of Seremban and Port Dickson.

LOCATION

Upper Muar River Basin, Kuala Pilah District, Negeri Sembilan

CLIENT

Jabatan Bekalan Air, Negeri Sembilan

COMPLETION DATE

1999

DETAIL WORKS INCLUDED

• 54m high x 554m length secondary dam
• 56m high multi-level draw-off RC tower
• 2.7m nominal diameter tunnel for 6.2km length
• 70m high x 270m length modified homogeneous embankment
• Associated structures such as pumping station, access road and intakes

SERVICES PROVIDED

• Geotechnical investigation & survey
• Environmental impact assessment
• Bid Evaluation


• Hydrology & hydraulic studies
• Detailed design
• Construction Supervision


• Water resources studies
• Contract Documentation
• Testing, Commissioning & Handing Over

KAJIAN KEJURUTERAAN SISTEM BEKALAN AIR EMPANGAN BATU HAMPAR, REMBAU, NEGERI SEMBILAN

The project consists of a 50m high dam at Sg. Batu Hampar with a storage volume of 2.5 million m3 and a 30m wide barrage at Sg. Rembau to enable abstraction of 100 MLD to meet the water supply requirements up to year 2020 for domestic and industrial uses in the districts of Rembau and Port Dickson (South), Negeri Sembilan.

LOCATION

Negeri Sembilan

CLIENT

Jabatan Bekalan Air, Negeri Sembilan

COMPLETION DATE

2010

DETAIL WORKS INCLUDED

• Assessment of proposed Sg. Batu Hampar Dam and Sg. Rembau Barrage
• Feasibility study of proposed water supply system including hydrological modelling for Sg. Rembau Intake
• Conceptual Design of RCC Dam, 100 MLD Water Treatment Plant, Pump House, Intake, Barrange, Reservoirs and Pipelines
• Water demand analysis and projection of water demand to meet the residential, institutional, commercial and industrial supply

SERVICES PROVIDED

• Preliminary environmental impact assessment


• Detailed engineering investigation


• Conceptual design

Integrated Management System
&
Quality Policy

MS ISO 9001:2015 Quality Management Systems

MS ISO 14001:2015 Environmental Management System

MS ISO 45001:2018 Occupational Health and Safety Management System