Drainage & Irrigation
STORMWATER MANAGEMENT AND ROAD TUNNEL PROJECT (SMART)
The Project is a Flood Mitigation Scheme to provide flood relief to the Kuala Lumpur City Center utilising a flood bypass tunnel system as well as a traffic dispersal scheme to ease traffic congestion at the southern main gateway to KL City near the Sg. Besi Airfield.
LOCATION
Kuala Lumpur
CLIENT
MMCEG-Gamuda JV
COMPLETION DATE
2007
DETAIL WORKS INCLUDED
• Operation Control Center
• Channelisation of Sg Klang and Sg Kerayong
• Upstream holding ponds & downstream storage reservoir
• Twin Box Release Culvert to release flood discharge into Sg Kerayong
• Stormwater Bypass Tunnel of approximately 9.7km by 11.8m internal diameter cum motorway tunnel of about 3.0km
• Ingress/egress connection to link the motorway tunnel to Kuala Lumpur-Seremban Highway near Sg Besi Airfield & Jalan Tun Ismail/Jalan Tun Razak
• Associated Control Structures
- Sg Klang Diversion Weir & Offtake Structure
- Tunnel Intake & Offtake Structure
- Sg Kerayong Intake & Offtake Structure
- Gates, Stoplogs & Debris Control
SERVICES PROVIDED
• Geotechincal Investigation & Survey
• Contract Documentation
• Hydrology & Hydraulic Studies
• Construction Supervision
• Detailed Design
CYBERJAYA FLAGSHIP ZONE DEVELOPMENT – PHASE I & II MAIN DRAINAGE
LOCATION
Multi Media Super Corridor, Klang Valley
CLIENT
Setia Haruman Sdn Bhd
COMPLETION DATE
Current
DETAIL WORKS INCLUDED
• Flood attenuation ponds
• Network of closed & open drains
• Drainage reserves to double up for recreational use
• Landscaping at attenuation ponds and drainage reserves for a green design
• Landfills to raise platform levels at selected locations to enable gravity operation of drainage system
SERVICES PROVIDED
• Hydrology (Rational Formula for flood flow analysis)
• Hydraulics (EXTRAN-XP for flood profile analysis)
• Detailed Design of drains, attenuation ponds and associated structures
• Economic analysis
• Drainage masterplan
• Tender documentation, engineer’s cost estimate
• Drainage conceptualization
• Geotechnical Investigation & Survey
• Construction Supervision
DESIGN AND BUILD SUNGAI KERAYONG RIVER IMPROVEMENT WORKS ALONG 1.8KM FROM SUNGAI KERAYONG/ SUNGAI KLANG CONFLUENCE TO SMART’S DISCHARGE POINT, KUALA LUMPUR
LOCATION
Kuala Lumpur
CLIENT
Kumpulan Sakata Sdn. Bhd.
COMPLETION DATE
2010
DETAIL WORKS INCLUDED
• Provide suitable transition at the interfaces
• Bed control structure immediately upstream of SMART discharge point
• Upgrading / improvement to the channel section between the bed control structure and confluence (approximate length:1800 metres)
• Drainage outfalls, perimeter drains, sumps and any other works necessary (including the relocation, repair and removal of existing drainage structures) to maintain the functionality of existing sub-surface and surface drainage
SERVICES PROVIDED
• Detailed Design
• Construction Supervision
• Hydrology and Hydraulic Studies
• Contract Documentation
• Civil, Geotechnical and Structural Engineering Works
Integrated Management System
&
Quality Policy
MS ISO 9001:2015 Quality Management Systems
MS ISO 14001:2015 Environmental Management System
MS ISO 45001:2018 Occupational Health and Safety Management System