Highway

NORTH SOUTH INTERURBAN TOLL EXPRESSWAY

The Project comprises the construction of a dual 2-lane expressway from Pagoh to Ayer Hitam covering of distance of 60 km with four grade separated interchanges of Pagoh, Yong Peng North, Yong Peng South and Ayer Hitam.

LOCATION

Pagoh to Ayer Hitam

CLIENT

PLUS

COMPLETION DATE

1993

DETAIL WORKS INCLUDED

• 4 grade separated interchanges
• 60 km of dual 2-lane flexible pavement carriage way
• Soil treatment for soft and very soft ground terrain using vertical drain and surcharge with counterweight berm
• Associated infrastrucutre works such as river and land bridge, drainage culverts, interchange lighting, relocation and/or installation of utilities

SERVICES PROVIDED

• Master planning
• Construction supervision and administration


• Investigation works
• Installation of toll collection system


• Detailed design

CLOVERLEAF CUM DIRECTIONAL RAMP AT SUNWAY INTERCHANGE

The project comprises the construction of grade-separated interchange located in Klang Valley.  The forming part of the road network is from Damansara to Puchong which includes construction of new bridges and upgrading of existing road.

LOCATION

Kuala Lumpur

CLIENT

Gamuda-Irama Duta JV

COMPLETION DATE

1999

DETAIL WORKS INCLUDED

• Construction of new bridges and upgrading of existing road

SERVICES PROVIDED

• Investigation works


• Detailed design


• Construction supervision and administration

SUNGAI BESI - ULU KELANG ELEVATED EXPRESSWAY

Sungai Besi – Ulu Kelang Elevated Expressway (SUKE) is a 24.4km elevated expressway with mainline starting from the existing Shah Alam Highway (KESAS) at Bukit Jalil in the South to Middle Ring Road 2 (MRR2) at Ulu Kelang in the North. The expressway is generally a dual 3-lanes carriageway and operated on an open-toll system collection points at Alam Damai, Bukit Teratai and Ampang. The expressway has 14 grade-separated interchanges at Sri Petaling, Sungai Besi, Alam Damai, Cheras, Ampang and Ulu Kelang.

LOCATION

Kuala Lumpur

CLIENT

Turnpike Synergy Sdn Bhd (PROLINTAS)

COMPLETION DATE

Current

DETAIL WORKS INCLUDED

• Elevated bridge structure
• 5 Grade separated interchanges
• Upgrading of traffic flow configuration
• Associated infrastructure works such as roadwork, earthwork, drainage, highway and interchange street lighting and high-mast lighting
• Fully elevated new highway above existing KESAS Highway, BESRAYA Highway, MRR2, Persiaran Alam Damai and GRAND SAGA Highway Dual 3-lane elevated   carriageway
• Elevated double deck Toll Plaza, Multi Stories Layby, Administration & Supervision Buildings and Canopy including mechanical & electrical services Relocation   and / or Installation of Utilities and Relocation of TNB Pylons

SERVICES PROVIDED

• Master planning
• Soil investigation works
• Preliminary design and detailed design
• Lead consultant for 4 detailed design consultants
• Construction supervision and administration of contract
• Preparation of tender documents and contract documents and tender evaluation

LEBUHRAYA KEMUNING – SHAH ALAM (LKSA)

The Project comprises the construction of dual 3-lane carriageway from Kota Kemuning Interchange at KESAS Highway to Federal Highway Route 2 Interchange covering total distance of 14.7 km with 6 grade separated interchanges of Kota Kemuning, Jalan Bukit Kemuning, Alam Impian, Bulatan Jubli Perak, Bulatan Selangor and Federal Hihgway Route.

LOCATION

Shah Alam (Connecting KESAS Highway to Federal Highway Route 2)

CLIENT

Projek Lintasan Shah Alam Sdn Bhd (PROLINTAS)

COMPLETION DATE

2010

DETAIL WORKS INCLUDED

• 6 grade separated interchanges
• Upgrading of traffic flow configuration
• Dual 3-lane flexible pavement carriageway
• Reinforced concrete pavement carriageway at Toll Plaza
• Construction of new land and river bridges and widening of existing ones
• Associated infrastructure works such as roadwork, earthwork, drainage, highway and interchange street lighting and high-mast lighting
• Ground treatment using pile embankment with reinforced concrete slab, stone column and pre-fabricated vertical drain and surcharge with counterweight   berm

SERVICES PROVIDED

• Master planning
• Preparation of contract documents and tender   evaluation


• Investigation works
• Construction supervision and administration


• Detailed design

SEPUTEH INTERCHANGE

The construction of Seputeh Interchange formed part of the upgrading works for Old Klang Road, which was one of the most congested roads in Klang Valley. The main components of the interchange are the two elevated ramps linking Federal Highway and Old Klang Road with 568m and 389m long respectively. The 568m length of ramp carries eastbound traffic coming from Klang towards Old Klang Road while the 389m ramp carries westbound traffic from Kuala Lumpur towards Old Klang Road. The overall width of the ramp is 10m which is able to accommodate two traffic lanes.

LOCATION

Kuala Lumpur

CLIENT

Impian Hebat Sdn Bhd

COMPLETION DATE

2004

DETAIL WORKS INCLUDED

• Pump house
• TNB substation
• Vehicular box culvert
• Pedestrian box culvert
• Improvement of road pavement
• Cast off-site and erected using balanced cantilever method
• High-level directional ramps which were constructed using precast segments
• Associated civil/infra-structural works including roads, drainage culverts, sumps, manholes, concrete pipes, retaining structures and miscellaneous

SERVICES PROVIDED

• Tender/Detailed/As-built drawings
• Construction supervision


• Geotechnical investigation and foundation   design


• Detailed design of structural/civil elements

EAST-WEST LINK EXPRESSWAY

The Project comprises grade-separated interchange forming part of the road network from East-West Link to Kuala Lumpur.

LOCATION

Taman Connaught to Salak Interchange

CLIENT

Metramac Corporation Sdn. Bhd.

COMPLETION DATE

1993

DETAIL WORKS INCLUDED

• Construction of new bridges
• Toll collection system


• Upgrading of traffic flow configuration


• Improvement of road pavement

SERVICES PROVIDED

• Master planning
• Preparation of contract documents and tender   evaluation


• Investigation works
• Construction supervision and administration


• Detailed design

NEW KLANG VALLEY EXPRESSWAY

LOCATION

Selangor, Perak, Kedah, Johor

CLIENT

PLUS (Projek Lebuhraya Utara-Selatan)

COMPLETION DATE

1994

DETAIL WORKS INCLUDED

• Installation of Expressway Toll System
• Display of messages at the toll booths for the motorists
• Payment by stored value cards, prepaid cards and PLUS credit cards
• Point of sale terminal for issuance of stored value cards, prepaid cards and PLUS credit cards
• On-line transaction data transmission from Toll Plaza Computers to PLUS Headquarters EDP Computer and downloading of data/messages from
  EDP Computer to Toll Plaza Computers

SERVICES PROVIDED

• Construction supervision


• Contract administration


• Testing and commissioning

NORTH SOUTH CENTRAL LINK EXPRESSWAY

The project comprises the construction of grade-separated interchange located in Klang Valley. The forming part of the road network from USJ to NKVE covers a total length of 3.3km (including 2km of viaducts). The highway also includes the construction of new bridges, upgrading of traffic flow congestion and provisional of directional ramp.

LOCATION

Kuala Lumpur

CLIENT

ELITE

COMPLETION DATE

1997

DETAIL WORKS INCLUDED

• Construction of new bridges


• Upgrading of traffic flow congestion


• Provisional of directional ramp

SERVICES PROVIDED

• Investigation works


• Detailed design


• Construction supervision and administration

Integrated Management System
&
Quality Policy

MS ISO 9001:2015 Quality Management Systems

MS ISO 14001:2015 Environmental Management System

MS ISO 45001:2018 Occupational Health and Safety Management System