Industrial Plant

BITUMEN REFINERY PLANT, TERENGGANU

The Proposed Bitumen Refinery Plant at Kemaman, Terengganu is the first ever of its kind in South East Asia. The Bitumen Refinery Plant has a plot area of 268,280m2. The works also include the 2,000m long piping route from the Bitumen Refinery Plant to West Wharf and Chemical Jetty where the crude oil is unloaded from the supply ship and loaded to export ship.

LOCATION

Kemaman, Terengganu

CLIENT

Sumatec E&C Sdn. Bhd.

COMPLETION DATE

2007

DETAIL WORKS INCLUDED

• foundation for 26 nos of storage tanks
• firewater storage pond and detention pond
• earth bund wall to contain oil leaking and/or spillage
• reinforced concrete and structural steel of supporting facilities
• reinforced concrete foundations for machinery and equipment
• structural steel and reinforced concrete supports for piping and cabling
• Infrastructure works including road works, surface water drainage system, portable water supply and sewerage system

SERVICES PROVIDED

• Preparation of detailed design


• Coordination of construction works


• Authority submission

TITANIUM DIOXIDE PLANT (50,000 TPA)

The pigment plant comprises ilmenite storage, surface treatment and ore processing buildings, calciner building, settler building, pipe bridges, tank foundations, warehouse, workshop, gypsum separation, ore milling and reduction buildings, acid pipeline and storage facilities, water treatment plant, administration building, welfare building, operation centre, substations, utilities buildings.

LOCATION

Telok Kalong, Terengganu

CLIENT

Tioxide (Malaysia) Sdn. Bhd.

COMPLETION DATE

1992

DETAIL WORKS INCLUDED

• Earthworks
• Structural Steel


• Piling


• Reinforced Concrete

SERVICES PROVIDED

• Soil Investigation
• Quantity surveying
• Detailed engineering design for civil and   structural works


• Topographic survey
• Contract documentation
• Contract administration
• M&E building services


• Site preparation
• Tender evaluation
• Construction supervision

MPOB BIODIESEL PLANT

The proposed MPOB Biodiesel Plant with production capacity of 200MT/d is situated on a 6.4 acres palm oil estate in Carey Island, Selangor. The Plant produces biodiesel from refined palm oil in collaboration with Malaysian Palm Oil Board (MPOB), as the technology provider.

LOCATION

Carey Island, Selangor

CLIENT

Golden Hope Biodiesel Sdn. Bhd.

COMPLETION DATE

2007

DETAIL WORKS INCLUDED

• Pump House
• Boiler House
• Main Plant Building
• Guard House and Weighbridge Office
• Tank Farm and Associated Works


• Water supply
• TNB Sub-station
• Winterisation Plant Building
• Effluent Treatment Plant
• Road and drainage system


• Sewerage system
• 3 Storey Utility Building
• Loading/Unloading Bay
• Administration Building

SERVICES PROVIDED

• Soil Investigation
• Preliminary and detailed engineering design   for architectural, civil and structural works,   mechanical & electrical works


• Topographic survey
• Tender evaluation
• Tender and contract documentation
• Authority submission


• Contract administration
• Construction supervision
• Coordination of construction works

F&N PLANT AT SHAH ALAM SELANGOR

SSP involved in the modification of the existing F&N plant located at Shah Alam. The works comprised the upgrading of existing Bottling Line, Main Office Block extension and new car park sheds.

LOCATION

Shah Alam, Selangor

CLIENT

F&N Beverages Manufacturing Sdn. Bhd.

COMPLETION DATE

2010

DETAIL WORKS INCLUDED

• Upgrade existing bottling line


• Main office block extension


• New carpark sheds

SERVICES PROVIDED

• Soil Investigation
• Detailed engineering design for civil and   structural works


• Contract documentation
• M&E building services including fire fighting
• Construction supervision


• Tender evaluation
• Contract administration
• Authority Submission

CELLAR EXTENSION TO THE EXISTING PLANT

LOCATION

Heineken Malaysia Berhad, Kuala Lumpur

CLIENT

Heineken Malaysia Berhad

COMPLETION DATE

2019

DETAIL WORKS INCLUDED

• Demolition works
• Architectural and Structural of Store & Motor   Control Centre Room


• Foundation of Cellar
• Civil related works i.e. monsoon & process   drain


• Pipe bridge extension

SERVICES PROVIDED

• Site Supervision
• Budgetary Cost Estimation
• Project and Contract Administration
• Preliminary Design (Architectural, Civil & Structural)
• Submission to relevant authorities and Issuance of CCC
• Preparation of tender drawings and documentation for construction

JOTUN LIGER PAINT MANUFACTURING PLANT – PHASE 1

It is the largest plant of its kind in the Asia-Pacific region with an area size of 93,000m2. The completed Phase 1 project involved in the development of solvent-based paint factory with a maximum capacity of 41,400 MT/yr (or 159 MT/day) using Best Available Control Technology to protect the environment.
LOCATION

Nilai Industrial Estate, Negeri Sembilan

CLIENT

Jotun Paints (Malaysia) Sdn. Bhd.

COMPLETION DATE

2011

DETAIL WORKS INCLUDED

• Geotechnical
• Plant and Office Building
• Covered Tank Farm
• Process Piping & Pump Systems
• Domestic Sewerage Treatment


• Earthworks
• Water Supply
• Road & Drainage
• 11 KV Sub-Station


• HVAC
• Pipe Bridge
• Water Tanks
• Fire Pump Building

SERVICES PROVIDED

• Detailed design for Architectural, Civil & Structural and M&E

Integrated Management System
&
Quality Policy

MS ISO 9001:2015 Quality Management Systems

MS ISO 14001:2015 Environmental Management System

MS ISO 45001:2018 Occupational Health and Safety Management System