Power Plant

3 x 700 MW COAL FIRED POWER PLANT AT TANJUNG BIN, JOHOR DARUL TA’ZIM, MALAYSIA

The proposed power plant is having a nominal capacity of 2,100 MW, comprising 3 steam turbine units of 700 MW. A coal unloading jetty is constructed as part of the project to support the conveyor system adopted to transfer the imported coal from the vessel to the coal storage yard. Fly Ash Silo and Chimney structures are constructed to form part of the Ash Handling System for the power plant.

LOCATION

Tanjung Bin, Johor, Malaysia

CLIENT

Zelan Construction Sdn Bhd

COMPLETION DATE

2006

DETAIL WORKS INCLUDED

• Audit Design for Chimney and Silo
• Mechanical and Electrical Building Services
• Audit Design for Cooling Water Intake and Pump Pit, Cooling Water Settling Basin and Cooling Water Discharge System
• Design of temporary jetty, coal unloading jetty, trestle with roadway, Custom and Immigration Building, Electrical Building and associated infra-structural works   such as road, drainage, sewers, signages and safety barriers
• Coal storage yard, coal Transfer Tower Foundations, Coal Crusher House and Electrical House, Coal Conveyor Foundations, Stack Reclaimer Foundation, Coal   Control Building, Internal Earthing Building System and Ancillary Pipe Sleepers and equipment foundation within the coal yard

SERVICES PROVIDED

• Geotechnical Investigation and Design
• Audit of Specialist Sub-Contractor Design


• Detailed Design


• Construction Supervision

Integrated Management System
&
Quality Policy

MS ISO 9001:2015 Quality Management Systems

MS ISO 14001:2015 Environmental Management System

MS ISO 45001:2018 Occupational Health and Safety Management System