RAIL CONTAINER TRANSFER STATION (RCTS) AT TANJUNG PELEPAS, JOHOR
The Project comprises detailed design & construction of infrastructure development for Rail Container Transfer Station (RCTS)
LOCATION
Pelabuhan Tanjung Pelepas, Johor
CLIENT
Pelabuhan Tanjung Pelepas Sdn Bhd
COMPLETION DATE
2002
DETAIL WORKS INCLUDED
• Design of railway tracks
• Design of a bridge to link the RCTS to national rail network
• Infrastructure works e.g. pavement, drainage and E&M works
• Logistics for the transfer of containers between rail wagons and road vehicles
SERVICES PROVIDED
• Master Planning
• Preparation of Contract Documents & Tender Evaluation
• Investigation Works
• Construction Supervision and Administration
• Detailed Design
ELECTRIFIED DOUBLE TRACK FROM SEREMBAN - GEMAS
Detailed design of 97 km of railway covering earthworks, hydrology and hydraulic study, drainage, river training, soil improvement, retaining walls, viaducts, railway bridges, drainage culverts, roads, road over bridges, road under bridges, pedestrian overhead bridges, vehicular box culverts, stations and halts, quarters, depots, utilities relocation, mechanical and electrical services and other ancillary works.
LOCATION
Seremban – Gemas
CLIENT
IRCON International Limited
COMPLETION DATE
2012
DETAIL WORKS INCLUDED
• Infrastructure work, i.e., access road, surface water drainage system and sewerage system
• Reinforced concrete and structural steel component of building platforms and foundation
• Mechanical and electrical components such as electrical supply, UPS, water supply, lifts and pumps station
SERVICES PROVIDED
• Detailed design
• Authority submission
• Contract administration
• Construction supervision
ELECTRIFIED DOUBLE TRACK FROM GEMAS – JOHOR BAHRU
Preliminary design of 197 km of railway covering track works, yards, earthworks, hydrology and hydraulic study, drainage, river training, soil improvement, retaining walls, viaducts, railway bridges, drainage culverts, roads, road over bridges, road under bridges, pedestrian overhead bridges, vehicular box culverts, stations and halts, quarters, deports, utilities relocation, level crossings, mechanical and electrical services, system works comprising signaling, communication, electrification 25kV A.C. single phase and passenger information and CCTV systems and other ancillary works.
LOCATION
Gemas – Segamat – Kluang – Kulai – Kempas Baru – Johor Bahru
CLIENT
Ministry of Transport
COMPLETION DATE
2011
DETAIL WORKS INCLUDED
• Yards
• Track works
• Utilities relocation, level crossings
• Stations and halts, quarters, deports
• Earthworks, soil improvement, retaining walls
• Hydrology and hydraulic study, drainage, river training
• Viaducts, railway bridges, drainage culverts, roads, pedestrian overhead bridges, vehicular box culverts
• Mechanical and electrical services, system works comprising signaling, communication, electrification 25kV A.C. single phase and passenger information, CCTV systems and other ancillary works
SERVICES PROVIDED
• Detailed design
• Authority submission
• Contract administration
• Construction supervision
SEREMBAN - GEMAS ELECTRIFIED DOUBLE TRACK PROJECT - REMBAU STATION
The new Rembau KTM Station was constructed to replace the old station in order to cater for the proposed KTM Komuter service, which will commence once the electrified double track is completed. It consists of main and secondary station buildings, platforms, overhead pedestrian bridge connecting the buildings and platforms, and related infrastructural work.
LOCATION
Seremban/Johor
CLIENT
Ircon International Ltd
COMPLETION DATE
2014
DETAIL WORKS INCLUDED
• Infrastructure work, including access road, surface water drainage system and sewerage system
• Reinforced concrete and structural steel components of buildings and platforms, including the foundation
• Mechanical and electrical components such as electrical supply, UPS, water supply, lifts and pumps station
SERVICES PROVIDED
Detailed design
LIGHT RAIL TRANSIT SYSTEM PHASE 1 FOR KL PARAMOUNT TO KERINCHI, PETALING JAYA
LOCATION
Petaling Jaya
CLIENT
HSSI-Halcrow-De Leuw
COMPLETION DATE
1998
DETAIL WORKS INCLUDED
• Stations
• Precast prestressed segmental concrete box girders
• Substations
• R.C. piers, bearings
• Deck drainage
• Road intersections
SERVICES PROVIDED
• Survey
• Civil and structural design
• Traffic management plan
• Alignment design
• Contract administration
• Soil investigation
• Construction supervision
PROPOSED CONSTRUCTION AND COMPLETION OF LIGHT RAIL TRANSIT (LRT) INFRASTRUCTURE WORKS AT PUTRAJAYA, MALAYSIA
LOCATION
Putrajaya
CLIENT
MM Consultants Sdn Bhd
COMPLETION DATE
2004
DETAIL WORKS INCLUDED
• Geotechnical investigation
• Sewerage and drainage design for the tunnels and stations
• Foundation and temporary works for the cut and cover construction
• M&E design for all utility and service connections to the stations and tunnels
• Structural design of all the underground tunnels, stations, underpasses, ventilation shafts etc.
SERVICES PROVIDED
• Foundation Design
• Civil And Structural Detailed Design
• Preparation of Tender
• Construction Supervision
LIGHT RAIL TRANSIT SYSTEM TWO KUALA LUMPUR PHASE 1 SECTION 2B – TUNNEL WORKS
LOCATION
Kuala Lumpur
CLIENT
Hazama Corporation
COMPLETION DATE
1999
DETAIL WORKS INCLUDED
• Cross-passage
• Design audit of precast tunnel segment
• 2 km underground twin tunnels of 4.880m diameter
• Pump sump design
• Munshi Abdullah Intervention shaft
• Temporary shaft for launching / retrieving TBM
• Cast insitu junction ring beam
• Reinforced Concrete Retaining Wall
• Klang river bed concrete lining protection
SERVICES PROVIDED
• Authority submission
• 100 years flood level analysis
• Soil Investigation / analysis
• Tunnel alignment design
SCHEME AND PRELIMINARY ENGINEERING DESIGN CONSULTANCY SERVICES FOR KLANG VALLEY MASS RAPID TRANSIT (MRT) :-
SSP LINE NORTHEN PACKAGE, FROM SG BULOH TO JALAN IPOH
The KVMRT-SSP Line (Line 2) is one of the three main mass rapid transit lines (SBK Line, SSP Line, and Circle Line) under the Greater KL vision to create a holistic and integrated public transport networks. It starts from Sg. Buloh (interfacing with SBK Line) and ends at Putrajaya. The overall length of SSP Line is 52.2 km with 25 elevated stations and 11 underground stations.
LOCATION
Sungai Buloh-Serdang-Putrajaya
CLIENT
MMC-Gamuda Joint Venture
COMPLETION DATE
2014
DETAIL WORKS INCLUDED
• Major surface infrastructure works i.e. road realignment, earthwork, drainage, bridge work and huge amount of utility services relocations, realignments etc.
• Cut and cover system
• 13.7km viaduct sub-structure
• 10 elevated stations & 1 half sunken station
• 14.5km MRT rail alignment
• 8 nos. long span bridge viaducts
• Various M&E and system technical rooms
SERVICES PROVIDED
Scheme and Preliminary Engineering Design
SCHEME AND PRELIMINARY ENGINEERING DESIGN CONSULTANCY SERVICES FOR KLANG VALLEY MASS RAPID TRANSIT (MRT) :-
SSP LINE SOURTHERN PACKAGE, FROM SERDANG TO PUTRAJAYA
The KVMRT-SSP Line (Line 2) is one of the three main mass rapid transit lines (SBK Line, SSP Line, and Circle Line) under the Greater KL vision to create a holistic and integrated public transport networks. It starts from Sg. Buloh (interfacing with SBK Line) and ends at Putrajaya. The overall length of SSP Line is 52.2 km with 25 elevated stations and 11 underground stations.
LOCATION
Sungai Buloh-Serdang-Putrajaya
CLIENT
MMC-Gamuda Joint Venture
COMPLETION DATE
2014
DETAIL WORKS INCLUDED
• MRT alignment design
• Associated infrastructure works
• 6 nos. stations
• all electrical, mechanical and utility works
• Multi storey park and ride buildings
SERVICES PROVIDED
Scheme and Preliminary Engineering Design
dETAILED ENGINEERING DESIGN CONSULTANCY SERVICES FOR KLANG VALLEY MASS RAPID TRANSIT (MRT) :-
SSP LINE NORTHERN PACKAGE FROM SG BULOH TO JALAN IPOH
LOCATION
Kuala Lumpur
CLIENT
MMC-Gamuda Joint Venture
COMPLETION DATE
2022
DETAIL WORKS INCLUDED
• Surface infrastructure works ie. road alignment, earthworks, drainage, bridge work, utility relocations and realignments
• MRT alignment
• Cut and cover system
• Elevated and half sunken stations
• Viaducts sub-structure
• Long span bridge viaducts
• M&E and system technical rooms
SERVICES PROVIDED
• Detailed engineering design
• Construction and supervision
Integrated Management System
&
Quality Policy
MS ISO 9001:2015 Quality Management Systems
MS ISO 14001:2015 Environmental Management System
MS ISO 45001:2018 Occupational Health and Safety Management System